Renault Clio: Sequential gearbox gear lever: Removal - Refitting
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
D4F, and JA3
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
READ NEXT:
5-SPEED MANUAL SEQUENTIAL GEARBOX
I - GEARBOX TYPE/OIL TYPE CORRELATIONS:
II - STANDARDS AND PART NUMBERS OF THE
VARIOUS RECOMMENDED OILS:
Sequential gearbox: Bleeding
I - PROCEDURE
WARNING
Even
DP0
The automatic transmission series number can be
found in two places: on a label on the hydraulic distributor
cover (1) and etched onto the outer casing (2) on
the wheel side.
Automatic gearbox oi
SEE MORE:
REMOVAL
OPERATION FOR REMOVAL OF PART
CONCERNED
K85, and DOCUMENTATION PHASE 1
Move the rear fog light using the tool (Car. 1363) as a lever at (1).
B85 or C85 or S85, and DOCUMENTATION
PHASE 2
Move the rear fog light using the tool (Car. 1363) as a lever at (2).
Disconnect the rea
VEHICLE WITH KEY
REMOVAL
I - REMOVAL PREPARATION OPERATION
Unclip trim (1).
Remove:
the plasti-rivet (2),
the bolt (3).
Remove the door seal.
Unclip the dashboard side face (4).
Remove:
the bolt (5),
the dashboard lower trim (6).
Remove the lower cover (7).
Disco
© 2016-2025 Copyright Renault Clio Owners Club
