Renault Clio: Sequential gearbox gear lever: Removal - Refitting
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
D4F, and JA3
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
READ NEXT:
5-SPEED MANUAL SEQUENTIAL GEARBOX
I - GEARBOX TYPE/OIL TYPE CORRELATIONS:
II - STANDARDS AND PART NUMBERS OF THE
VARIOUS RECOMMENDED OILS:
Sequential gearbox: Bleeding
I - PROCEDURE
WARNING
Even
DP0
The automatic transmission series number can be
found in two places: on a label on the hydraulic distributor
cover (1) and etched onto the outer casing (2) on
the wheel side.
Automatic gearbox oi
SEE MORE:
I - LOCATION OF CONNECTORS
R 67 connector (Engine wiring harness/front left-hand
wiring connection).
Depending on the engine, connection R 67 is composed
of three or four connectors.
K4J or K4M
R 37 connector (Engine wiring harness/injection
connection).
D4F
R 37 connector (Engine wi
IMPORTANT
The circuits are designed to be pressurised, so be
careful at high temperatures (risk of serious burns).
Do not remove the cap from the expansion bottle
while the engine is hot.
Take care when carrying out a repair under the bonnet,
as the radiator fan(s) may start to operate without
wa
© 2016-2025 Copyright Renault Clio Owners Club
