REMOVAL
I - REMOVAL PREPARATION OPERATION


II - OPERATION FOR REMOVAL OF PART CONCERNED

REFITTING
I - REFITTING OPERATION FOR PART CONCERNED

II - FINAL OPERATION.
Exterior air temperature sensor: Removal - Refitting
REMOVAL
I - REMOVAL PREPARATION OPERATION
II - OPERATION FOR REMOVAL OF PART CONCERNED

REFITTING
I - REFITTING OPERATION FOR PART CONCERNED
II - FINAL OPERATION.
Solar radiation sensor: Removal - Refitting
CLIMATE CONTROL

REMOVAL
I - REMOVAL PREPARATION OPERATION

II - OPERATION FOR REMOVAL OF PART CONCERNED

REFITTING
I - REFITTING OPERATION FOR PART CONCERNED

II - FINAL OPERATION.
Air conditioning: Precautions for the repair
Air conditioning: Check
K4J or K4M or K9K or M4R, and Left-hand Drive
K9K, and Right-hand Drive