Renault Clio: Sequential gearbox gear lever: Removal - Refitting
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
D4F, and JA3
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the gear lever cover (1) using a screwdriver.

- Disconnect the gear lever lighting connector (2).

- Remove:
- the rear bolts (3) from the centre console,
- the front bolts (4) from the centre console.

- Remove the soundproofing (5) from the gear lever.

- Detach the connector (6) from the gear lever.
- Disconnect the gear lever connector.

- Remove:
- the bolts (7) from the gear lever base plate,
- the gear lever.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the gear lever,
- the gear lever base plate bolts,
- Connect the gear lever connector.
- Attach the gear lever connector.
- Refit:
- the gear lever soundproofing,
- the front bolts to the centre console,
- the rear bolts to the centre console.
- Connect the gear lever lighting connector.
- Refit the gear lever cover.
II - FINAL OPERATION.
- Connect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components) (MR 394,
21B, Sequential gearbox).
READ NEXT:
5-SPEED MANUAL SEQUENTIAL GEARBOX
I - GEARBOX TYPE/OIL TYPE CORRELATIONS:
II - STANDARDS AND PART NUMBERS OF THE
VARIOUS RECOMMENDED OILS:
Sequential gearbox: Bleeding
I - PROCEDURE
WARNING
Even
DP0
The automatic transmission series number can be
found in two places: on a label on the hydraulic distributor
cover (1) and etched onto the outer casing (2) on
the wheel side.
Automatic gearbox oi
SEE MORE:
With the engine switched off and on
level ground, the level when cold must
be between the MINI and MAXI marks
on reservoir 1.
Top this level up when cold before it
reaches the MINI mark.
When working in the engine
compartment, ensure that
the windscreen wiper stalk
is in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the door trim (see Front side door trim: Removal
- Refitting) (MR 393,72A, Side door trim),
the door lock barrel (see 51A, Side opening element
mechanisms, Front side door lock barrel:
Removal - Refitting, 51A-4).
Open the lock a
© 2016-2025 Copyright Renault Clio Owners Club
