Renault Clio: Pre-postheating unit: Removal - Refitting
K9K

REMOVAL
I - REMOVAL PREPARATION OPERATION
- Remove:
- the battery (see Battery: Removal - Refitting),
- the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove the pre-postheating unit mounting bolt (8).

- Disconnect the pre-postheating unit connector (9).
- Remove the pre-postheating unit.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Connect the pre-postheating unit connector.
- Refit the pre-postheating unit.
- Tighten to torque the pre-postheating unit mounting
nut (9 Nm).
II - FINAL OPERATION.
- Refit the battery (see Battery: Removal - Refitting)
READ NEXT:
K9K, and 764 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove the air filter box inlet air pipe (1).
Remove the turbocharger outlet air pipe retaining pins (2).
Remove:
the turbochar
K9K
K9K, and 764 or 766 or 768 or 772
First fitting of the exhaust gas cooler recirculation
assembly
(1) Exhaust gas recirculation solenoid
valve
(2) Exhaust gas cooler
(3) Exhaust gas inlet pipe
(4)
SEE MORE:
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or EQUIPMENT
LEVEL EA5
or EQUIPMENT LEVEL EAG, and DOCUMENTA
The tools included in the tool kit depend
on the vehicle.
Tool kit A is located in the tray under
the luggage compartment carpet.
Lift the cover and remove it.
Wheelbrace 1
Locks or unlocks the wheel bolts and
tow eye 5
Jack 2
Fold it correctly before refitting it in its
housin
© 2016-2025 Copyright Renault Clio Owners Club
