Renault Clio: Solenoid valves: Removal - Refitting
K9K, and JA5

REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
Before removing the solenoid valves, always
mark their respective connectors in order not to
mix them up.
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
- To discharge the accumulator, run command
" Discharge pressure accumulator " AC081.
To confirm the pressure drop, read the " Hydraulic
pressure " parameter for the resulting value.
If there is still pressure in the accumulator, re-run the
" Discharge pressure accumulator " command until
the pressure is negligible and will not pose a risk
when the high pressure pipes are removed.
The pressure reading must be close to zero.
- Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
- Remove the actuator module (see 21B, Sequential
gearbox, Actuator module: Removal - Refitting, 21B-34).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove:
- the bracket bolts on the actuator module (1),
- the actuator module bracket (2).

- Remove the solenoid valve affected, following the
correct removal order for the solenoid valves:
- Clutch solenoid valve
- Selection solenoid valve 4
- Selection solenoid valve 3
- Engagement solenoid valve 1
Note:
Remove engagement solenoid valve 2 (5) independently
of the other solenoid valves.
REFITTING
I - REFITTING PREPARATION OPERATION
- Refit the actuator module (see 21B, Sequential
gearbox, Actuator module: Removal - Refitting, 21B-34).
II - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the solenoid valve affected,
- the bolts from the solenoid valve,
- the actuator module bracket.
- Tighten to torque:
- the solenoid valve bolts (4 N.m),
- the bracket bolts on the actuator module (4
N.m).
III - FINAL OPERATION
- Perform the following operations:
- bleed the clutch circuit (see 21B, Sequential gearbox,
Sequential gearbox: Bleeding, 21B-
84)
- the necessary programming (see Fault finding -
Replacement of components (MR 394, 21B, Sequential
gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil is at the MIN mark.
D4F, and JA3

REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
Before removing the solenoid valves, always
mark their respective connectors in order not to
mix them up.
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
- To discharge the accumulator, run command
" Discharge pressure accumulator " AC081.
To confirm the pressure drop, read the " Hydraulic
pressure " parameter for the resulting value.
If there is still pressure in the accumulator, re-run the
" Discharge pressure accumulator " command until
the pressure is negligible and will not pose a risk
when the high pressure pipes are removed.
The pressure reading must be close to zero.
- Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
- Remove the actuator module (see 21B, Sequential
gearbox, Actuator module: Removal - Refitting, 21B-34).
II - OPERATION FOR REMOVAL OF PART
CONCERNED

- Remove:
- the bracket bolts on the actuator module (1),
- the actuator module bracket (2).

- Remove the solenoid valve affected, following the
correct removal order for the solenoid valves:
- Clutch solenoid valve
- Selection solenoid valve 4
- Selection solenoid valve 3
- Engagement solenoid valve 1
Note:
Remove engagement solenoid valve 2 (5) independently
of the other solenoid valves.
REFITTING
I - REFITTING PREPARATION OPERATION
- Refit the actuator module (see 21B, Sequential
gearbox, Actuator module: Removal - Refitting, 21B-34).
II - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the solenoid valve affected,
- the bolts from the solenoid valve,
- the actuator module bracket.
- Tighten to torque:
- the solenoid valve bolts (4 N.m),
- the bracket bolts on the actuator module (4
N.m).
III - FINAL OPERATION
- Perform the following operations:
- bleed the clutch circuit (see 21B, Sequential gearbox,
Sequential gearbox: Bleeding, 21B-
84)
- the necessary programming (see Fault finding -
Replacement of components (MR 394, 21B, Sequential
gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil is at the MIN mark.
READ NEXT:
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Batt
K9K, and JA5
(1) Clutch solenoid valve
(2) Gear engagement solenoid
valve
(18) Gear engagement solenoid
valve
(4) Selection solenoid valve
(5) Engagement sensor
(20) Gear selection sensor
(7) Solen
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
WARNING
To remove the gear selection sensor it is essential
that you shift to first gear before removal.
Remove:
the battery (see Battery: R
SEE MORE:
Courtesy light
Unclip the lens 1 (using a flat-bladed
screwdriver or similar).
Remove the bulb concerned.
Bulb type: W5W.
Luggage compartment light
Unclip the light 2 by pressing the tab on
its left side (using a flat-bladed screwdriver
or similar).
Remove the bulb concerned.
Replacing the battery
When the message “KEYCARD
BATTERY LOW” appears on the instrument
panel, replace the RENAULT card
battery, press button 1 pulling on emergency
key 2, then unclip the cover 3
using tab 4.
Remove the battery by pressing on one
side (movement A) and by lifting the
ot
© 2016-2026 Copyright Renault Clio Owners Club - 0.0038
