K9K
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the battery (see Battery: Removal - Refitting),
the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery).
II
K9K, and 764 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove the air filter box inlet air pipe (1).
Remove the turbocharger outlet air pipe retaining pins (2).
Remove:
the turbochar
K9K
I - RISKS RELATING TO CONTAMINATION
The high-pressure direct injection system is highly sensitive
to contamination. The risks caused by contamination
are:
damage to or destruction of the high pressure injection
system,
a component seizing,
a component not being properly sealed.
All After-S
K9K, and 750 or 760 or 762 or 764 or 766 or 768
High pressure pump
Flow regulation solenoid valve
Pressure regulation solenoid
valve
Diesel temperature sensor
Spacer between the cylinder
head and the injector clamp
Injector clamp
Diesel injector fuel return pipe
Diesel injector
High pre