Renault Clio: Cylinder head: Removal -
Refitting
READ NEXT:
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Disconnect the battery (see Battery: Removal - Refitt
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the engine cover,
the engine undertray bo
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the engine cover,
the engine undertray,
SEE MORE:
K9K
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the battery (see Battery: Removal - Refitting),
the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
Remove the pre-postheating unit mounting bolt (8).
AIR CONDITIONING or CLIMATE CONTROL
Note:
The evaporator is supplied already assembled in
the distribution unit. (1)
REMOVAL
OPERATION FOR REMOVAL OF PART
CONCERNED
Remove the distribution unit (see 61A, Heating,
Distribution unit: Removal - Refitting, 61A- 50).
REFITTING
REFITTING OPERATION FO
© 2016-2025 Copyright Renault Clio Owners Club
