K9K
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the battery (see Battery: Removal - Refitting),
the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery).
II
K9K, and 764 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove the air filter box inlet air pipe (1).
Remove the turbocharger outlet air pipe retaining pins (2).
Remove:
the turbochar
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
Before removing the solenoid valves, always
mark their respective connectors in order not to
mix them up.
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the acc
K9K
I - RISKS RELATING TO CONTAMINATION
The high-pressure direct injection system is highly sensitive
to contamination. The risks caused by contamination
are:
damage to or destruction of the high pressure injection
system,
a component seizing,
a component not being properly sealed.
All After-S