REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
K9K
Remove the heater plugs (see 13C, Preheating,
Heater plugs: Removal - Refitting, 13C-2).
Disconnect:
the pressure regulation solenoid valve connector (1),
the flow control solenoid valve connector (2),
Fit the hose end piece (Mot. 1592) in place of one of
the removed plugs.
AIR CONDITIONING or CLIMATE CONTROL
Equipment required
Dual-sensor temperature measuring device
Note:
When performing RENAULT maintenance, check
the air conditioning system at the end of the vehicle's
maintenance program so that the engine will
be cold.
I - PREPARATION OPERATION FOR THE
MEASUREMENT