REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
Mobile floor
When fitted to the vehicle, it can be
used to make loading easier.
Note: if you need to access the ISOFIX
ring and/or the net ring at the bottom of
the boot, open flap 3.
Maximum weight for the mobile
floor: 100 kg evenly distributed.
Movable floor storage
K9K, and 750 or 752 or 764 or 766 or 768
To configure the computer, (see MR 394 Fault finding,
Diesel Injection, Configuration and programming).
Diesel injection computer: Removal - Refitting
K9K
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the battery (see Battery: Removal - Refitting