EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
M4R
The engine and gearbox assembly must be removed
to remove/refit the camshaft dephaser (see
10A, Engine and cylinder block assembly, Engine
- gearbox assembly: Removal - Refitting, 10A-112).
For the camshaft dephaser removal-refitting procedure
(see ) (Technical Note 6020A, 10A, Engine and
Useful capacity of fuel tank: approx.
45 litres.
The engine 0,9 TCe has a fuel tank capacity
of 40 litres or 45 litres (depending
on the vehicle).
To open cover A, place your finger into
recess B.
When filling, use the cap holder 1 on
the cover A to secure the cap 2.
Afte