EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
Door sealing film: Removal - Refitting
REMOVAL
Note:
The sealing film can only be used once; it is destroyed
when it is removed.
It is essential to replace the film with a new one
each time it is removed.
REMOVING THE SEALING FILM
Remove the door trim( (see Front side door trim:
Removal - Refitt
Front side door glass run channel: Removal - Refitting
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the door trim( (see Front side door trim: Removal
- Refitting) (MR 393, 72A, Side opening elements
trim),
the interior weatherstrip,
the door mirror( (see Door mirror: Removal - Refit