REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
I - MAIN REFERENCE POINTS BEFORE TRIM-SETTING
1 - Front sub-frame in place
The jig crowns the front sub-frame rear mounting bolt (A).
Use this situation for a rear impact or a light frontal impact
without removal of the mechanical components.
2 - Front mechanical components removed
The jig rests
D4F, and 740 or 742 or 764, and STANDARD HEATING
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
Remove:
th