EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
Cut the exhaust pipe (see 19B, Exhaust, Exhaust:
Precautions for the repair, 19B-19) (see )
(MR
LEFT-HAND DRIVE, and CLIMATE CONTROL
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove the centre console (see Centre console:
Removal - Refitting) (MR 393, 57A, Interior equipment).
Unclip the trim at (1) and (2) at the base of the dashboard.
II - OPERATION FOR REMOVAL OF PART
CONCERNED
D