EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
Topping up/filling
The vehicle must be parked on level
ground and the engine should be cold
(for instance, before the engine is started
up for the first time in the day).
Before performing any
action in the engine compartment,
the ignition must
be switched off by pressing
K9K, and 750 or 752 or 766 or 768
To configure the injectors, (see MR 394 Fault finding,
Diesel Injection, Configuration and programming).
Diesel injector: Removal - Refitting
K9K, and 764 or 772
IMPORTANT
To avoid all risk of damage to the systems, apply
the safety and cleanliness instructions