EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
LEFT-HAND DRIVE
REMOVAL
I - REMOVAL PREPARATION OPERATION
Place hose clamps (Ms. 583) on the heater matrix hoses at (1).
Remove:
the heater matrix hose clips,
the heater matrix hoses,
the centre console (see Centre console: Removal
- Refitting) (MR 393, 57A, Interior equipment).
LEFT-HAND DRIVE
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the glovebox (see Glovebox: Removal - Refitting)
(MR 393, 57A, Interior equipment),
the front right-hand A-pillar air distribution duct (see
61A, Heating, Front footwell air distribution
duct: Removal - Refitting, 61A-106