EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
PANORAMIC SUNROOF
REMOVAL
OPERATION FOR REMOVAL OF PART
CONCERNED
Unclip the roof opening control using a flat-blade screwdriver (1).
Disconnect the connectors.
REFITTING
REFITTING OPERATION FOR PART CONCERNED
Connect the connectors.
Clip the sunroof opening control.
Sunroof operating mecha
D4F
D4F, and 740 or 742 or 764
Air inlet
Air inlet trunking
Air filter unit
Motorised throttle valve
Inlet manifold
D4F, and 784
air inlet
Air filter box air inlet pipe
Air filter unit
Air filter box outlet air pipe
Turbocharger air outlet pipe
Intercooler
Intercooler air outlet pip