REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
D4F or F4R or K4J or K4M or K9K or M4R
IMPORTANT
During this operation, be sure to:
be careful of fuel splashes when disconnecting the
union.
IMPORTANT
Wear goggles with side protectors for this operation.
IMPORTANT
Wear latex gloves during the operation.
WARNING
To prevent impurities from ente
K9K, and 750 or 752 or 764 or 766 or 768
IMPORTANT
during this operation, it is essential to:
beware of fuel splashes when disconnecting the
union,
protect sensitive areas from fuel outflow.
IMPORTANT
Wear gloves during this operation.
IMPORTANT
Wear goggles with side protectors for this opera