REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
Remove:
the front left-hand wheel (see Wheel: R
K9K, and 750 or 752 or 766 or 768
Operating diagram of the diesel fuel supply circuit
The circuit comprises:
a sender (1),
a priming bulb (2),
a fuel filter (3) that can be fitted with a water detection
sensor,
a high pressure pump (4) with a built-in mechanical
low pressure pump (transfer p