K9K
K9K, and 764 or 766 or 768 or 772
First fitting of the exhaust gas cooler recirculation
assembly
(1) Exhaust gas recirculation solenoid
valve
(2) Exhaust gas cooler
(3) Exhaust gas inlet pipe
(4)
K9K, and 764 or 766 or 768
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the bat
K9K, and 764 or 766 or 768 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect
K9K, and 750 or 760 or 762 or 764 or 766 or 768
High pressure pump
Flow regulation solenoid valve
Pressure regulation solenoid
valve
Diesel temperature sensor
Spacer between the cylinder
head and the injector clamp
Injector clamp
Diesel injector fuel return pipe
Diesel injector
High pre
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (56A, Exterior equipment),
the scoop under the scuttle panel gril