REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR392, 02, Lifting equipment).
Remove:
the lower bolts (1).
the front pa
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the f
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1 - EQUIPMENT LEVEL E3 LEISURE
or
EQUIPMENT LEVEL EA1 or EQUI
Original parts are based on strict specifications and are subject to highly-specialised
tests. Therefore, they are of at least the same
level of quality as the parts fitted originally.
If you always fit genuine replacement parts to your vehicle, you will ensure
that it performs well. Further
K85
REMOVAL
OPERATION FOR REMOVAL OF PART
CONCERNED
Remove:
the blanking covers (1),
the nuts (2).
Unclip the tailgate spoiler at (3).
Disconnect:
the high level brake light connector,
the rear screen washer jet pipe.
Remove the tailgate spoiler.
REFITTING
I - REFITTING PRE