K9K
K9K, and 764 or 766 or 768 or 772
First fitting of the exhaust gas cooler recirculation
assembly
(1) Exhaust gas recirculation solenoid
valve
(2) Exhaust gas cooler
(3) Exhaust gas inlet pipe
(4)
K9K, and 764 or 766 or 768
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the bat
K9K, and 764 or 766 or 768 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect
DP0
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove the front left-hand wheel arch liner (see
Front wheel arch liner: Removal - Refitting) (MR
393, 55A, Exterior protection).
Remove the resonator on the battery.
Disconnect the battery (see ) (MR 392, 80A, Battery).
II - OPERATION FOR REMOVAL
Before towing, unlock the steering
column: with the clutch depressed,
engage first gear (lever in position N
or R for vehicles with automatic gearboxes),
insert the RENAULT card in the
card reader, then press the engine start
button for two seconds.
Reposition the lever to neutral (position