REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Remove:
the battery (see Battery: Remova
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Battery: Removal
REMOVAL
I - REMOVAL PREPARATION OPERATION
Put the vehicle on a two-post lift (see Vehicle: Towing and lifting).
Disconnect the battery (see Battery: Removal - Refitting).
Remove:
the non-ret
The equipment fitted, described below, DEPENDS ON THE VERSION AND COUNTRY.
Side air vent.
Passenger Airbag location.
Heating or air conditioning controls.
Multimedia touch-screen.
Windscreen demister outlet.
Hazard warning lights switch.
Door electric locking switch.
Centre air
Detach the turbocharger front temperature sensor
wiring harness on the injector rail protector mounting.
Remove:
the injector rail protector mounting bolts (13),
the injector rail protector support.
Disconnect:
the damper valve connector (14) (if equipped),
the camshaft position