REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Remove:
the battery (see Battery: Remova
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Battery: Removal
REMOVAL
I - REMOVAL PREPARATION OPERATION
Put the vehicle on a two-post lift (see Vehicle: Towing and lifting).
Disconnect the battery (see Battery: Removal - Refitting).
Remove:
the non-ret
Heated seat pad: Removal - Refitting
WITHOUT SPORT SEATS, and DOCUMENTATION PHASE 1
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the front seat (see 75A, Front seat frames and
mechanisms, Complete front seat: Removal -
Refitting, 75A-33),
the seat base trim (see 77A, Front seat trim,
WARNING
Leave the rain sensor in place on the old windscreen
during the replacement operation.
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the scuttle panel grille (see 56A, Exterior equipment,
Scuttle panel grille: Removal - Refitting, 56A-1),
the windscreen trims (see 54A, Windows,