D4F or K9K, and JA3 or JA5
I - SEQUENTIAL GEARBOX
WARNING
If any operation is carried out on the electro-hydraulic
unit, it is essential to clean the unit using a cleaning
product and compressed air.
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
When replacing the electric pump assembly,
always replace the control relay.
IMPORTANT
Before any operation on the sequential system,
disc
IMPORTANT
Before carrying out any work on or near a safety
system component, lock the airbag computer
using the Diagnostic tool. When this function is
activated, all the trigger lines are disabled and
the airbag instrument panel warning light is lit
when the ignition is switched on.
IMPORTANT
Handl