D4F or K9K, and JA3 or JA5
I - SEQUENTIAL GEARBOX
WARNING
If any operation is carried out on the electro-hydraulic
unit, it is essential to clean the unit using a cleaning
product and compressed air.
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
When replacing the electric pump assembly,
always replace the control relay.
IMPORTANT
Before any operation on the sequential system,
disc
Rear axle assembly: Adjustment values
EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
I - PRELIMINARY OPERATIONS
Before checking the axles on the test bench, check the
tyre press
REMOVAL
I - REMOVAL PREPARATION OPERATION
Remove:
the door trim (see Front side door trim: Removal
- Refitting) (MR 393,72A, Side door trim),
the door lock barrel (see 51A, Side opening element
mechanisms, Front side door lock barrel:
Removal - Refitting, 51A-4).
Open the lock a